-
Representative sample
For sheet metal work, bring a coil length that matches the progressive-die pitch and scrap-cutter layout. Off-centre loads need an application note from the plant, not an assumption that bed tonnage is uniform.
-
Demonstration
Watch decoiler, straightener and feeder timing against the slide. If those units are plant-side, say so; a press-only quote is not a cell quote. Connected load in kW and three-phase supply still belong in the same brief.
-
Acceptance record
Log feed interruptions, scrap behaviour and recovery time. A successful empty press cycle is not acceptance of the production cell. Compare operating contexts on the applications page.